3. Don’t open any sealing parts such as the cover of electrical box , out doors in the overcast and.图14电气元件位置图图15隔爆型端子接法图16隔爆型穿线密封圈Z20/Z30 The nominal diameter of the entrance cable
1.检查行程或力矩控制机构
c). Revolve the closed indicator dial so that the closed mark can aim at the pointer ;
③ One phase disengages ;> >·m(45kgf·m),推力型接口,输出转速
centralized explosive condition ( or don’t remove and test the equipment with the power under the
Ⅱ.Working Conditions and Technical Data See picture 3 about its
1.行程或力矩控制机构有故障
YDF/YBDF (2) If the closed torque Tsc is used to control the closed valve the self-maintained line of the